Monday, January 14, 2019

More Elevator Covering

Continued our work on the two elevators.  The pre-shrunk lightweight fabric was removed from the frame.  Two fabric gussets were made from this material.  One for the trim servo mounting fabric plate and the other to cover a plastic grommet where the trim servo cable exits the elevator frame.  These two gussets were installed on the elevator.  Also, trim tab covering was started.  U500 adhesive was added to the trim tab frame and the fabric was attached on one end.  Hours: 1.5

Ed Working on Trim Tab

No comments: