Wednesday, August 8, 2018

Pitch Servo Mounting

After finishing the pitch servo mount yesterday, today's task was to get it installed on the mounting plate that was previously installed.  Due to the space required for the servo mount, it was found that some rivets for stiffening bracket were going to interfere.  Two rivets were drilled out.  The holes from the removed rivets line up with the mounting holes in the servo mounting bracket.  After positioning the servo and mount to the needed location it was clamped in place.  The four mounting hole locations were drilled for AN3 hardware.  Once drilled it was disassembled, deburred and then re-assembled with the correct AN3 bolts/washers/nuts.  Hours: 1.5

Pitch servo in it's final location

No comments: