Vertical fin fitted, leveled, and installed. Some powdercoat had to be removed and tubing length trimmed slightly for fit. (MHC, EJB) Hours: 4
Monday, October 20, 2014
Wednesday, October 15, 2014
Saturday, October 4, 2014
Rotisserie jig strengthened
Added angle bracket on side of Rotisserie. Also changed the angle steel piece to a square tubular piece for added strength. These changes were made to eliminate some swaying of the fuselage from left to right when placed in the jig. Jig was then repainted (brown and white) (EJB) Hours: 3
Labels:
Jigs
Subscribe to:
Posts (Atom)