Rear baggage area with flooring |
Sunday, December 13, 2015
Baggage Flooring
Trimmed and deburred the edges of the aluminum sheets that make up the baggage flooring and back of baggage bay. Additional trimming was done to allow space for the interior finishing fabric to pass between the aluminum sheet and the frame. We also up-drilled the fastener holes for these sheets to the final size (1/8"). These panels are currently cleco'd in place. Hours: 4
Sunday, December 6, 2015
Elevator Push-Pull Tube
Installed the short elevator push-pull tube that connects the bell-crank (which also attaches to the long push-pull tube) to the elevator horn. Had to bend the tube up slightly (about 0.5 inch deviation) in front of the front bearing point to alleviate friction. The elevators are not installed yet, so there is currently no connection to the elevator horn. Hours: 1.5
Saturday, December 5, 2015
Control Sticks Installation
Drilling Control Stick Bolt Hole |
Control Sticks Installation Completed |
Push-Pull Tube Installation
Installed Long Push-Pull tube, which connects from the control stick mixer to a bell crank in the aft fuselage. The tube had to be bent slightly in front of the front bushing (about 1 to 1.5 inch deviation), and also slightly rear of the back bushing (about 1/2 inch deviation) to relieve binding at the bearing points. Hours: 1.5
Bending the push-pull tube |
Push-pull tube attached to horn on control stick mixer |
Push-Pull tube attached to bell crank in rear |
Friday, December 4, 2015
Subscribe to:
Posts (Atom)