With the epoxy varnish dry, the near completed left wing was moved back to storage in the rafters of our storage shed. The second wing was brought down from the rafters and moved to the garage to start the work on the right wing. Hours: 1
|
Ed and Mike moving the Wing to Storage |
No comments:
Post a Comment