Saturday, March 3, 2018
Right Wing drains, etc
We drilled 1/4 inch drain holes in each bay of the right wing, similar to what we had already done on the left wing. We also drilled holes in two of the fabric backing plates on the left wing for installation of nut plates. Again, this is something we had done on the left wing, and needed to duplicate on the right wing. The rivet holes were either dimpled or countersunk (depending on the location) because we'll be using flush-mounted rivets. Hours: 1.5
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment