Ed continued to work on the right wing leading edge cuffs. Ed is doing some prep work before we add the epoxy filler to finish off the cuff installation.
While Ed was working on the Cuff, Michael installed the the rudder control cables that were previously made. Currently the cables were routed to just behind the baggage area bulkhead and will remain there until after the fuselage is covered with fabric.
|
Rudder cables installed in the fuselage |
Finally the F-2200 rear windshield bracket that was previous trimmed to size was clamped into position making sure it was centered. A straight edge was also clamped between the two but ribs and the bracket was positioned such that it was at the same level. Five of the six hole locations were drilled and cleco'd. The sixth position could not be drilled while the wing folded. Once we unfold the right wing the last location will be drilled. Hours: 2
|
Rear windshield bracket installed |