We finished installing the last of the tapes on the fuselage. This included the long tapes along the bottom edges of the right and left sides, a couple of smaller tapes near the footwell, a horizontal tape along the bottom edge of the firewall, and the tape along the back of the vertical stabilizer. Hours: 10.5
Tapes along bottom edge, and front of footwell added
Taping completed on sides of fuselage
Tape added along back edge of vert. stabilizer
Vert stabilizer with all finishing tapes installed
No comments:
Post a Comment