Monday, February 1, 2016

Flap Handle Installed

The flap handle was installed.  The assembly was positioned such that there was 3/16" clearance from a fuselage cross-member when the handle is full forward.  Three washers were used as temporary spacers to get the spacing right. The elevator push-pull tube had to be temporarily removed in order to drill one of the 4 mounting holes due to interference.  Once the flap handle was installed, the push-pull tube was reinstalled.  Hours: 1.5

Flap handle (center of picture)