Flap handle (center of picture) |
Monday, February 1, 2016
Flap Handle Installed
The flap handle was installed. The assembly was positioned such that there was 3/16" clearance from a fuselage cross-member when the handle is full forward. Three washers were used as temporary spacers to get the spacing right. The elevator push-pull tube had to be temporarily removed in order to drill one of the 4 mounting holes due to interference. Once the flap handle was installed, the push-pull tube was reinstalled. Hours: 1.5
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment