Thursday, February 4, 2016
Reaming Elevator and Horizontal Stabilizer
The holes for the Elevator and Rudder attach points needed to be reamed to remove the powder coat in the holes. The matching holes on the horizontal and Vertical stabilizers also need reaming. Most of the holes were easily done with a drill attached HSS reamer. There were a few hard to reach holes that needed some ingenuity. The reamer was attached to a drill bit extension which provided the leverage to spin the reamer without an attached drill. Hours: 1.0
Labels:
Empennage
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment