A short rib that will be attached between the fuel tank and the trailing edge (providing a surface for fabric attachment) was readied for installation. It will be installed half way between the ribs that are on each side of the fiberglass gas tank. The rivet holes for attachment were drilled, and the trailing edge aluminum was dimpled for counter-sunk rivets. Hours: 0.5
No comments:
Post a Comment