Sunday, February 4, 2018
Filler and wingtip, cont.
Continued work on the wingtip and adding filler to smooth out transitions on the right wing. Drilled holes in wingtip and installed some of the nutplates. We didn't have enough rivets of the right length, so need to order some more. 3M lightweight filler was added to close in the slots for the hinges (clear tape was placed on the trailing edge surface to cover the slots prior to adding the filler which made the job a little cleaner). Hours: 2.5
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment