Saturday, April 21, 2018

Header Tank


Built a small wooden jig with notches to hold the header tank in a horizontal position during drilling.  Drilled holes for fuel inlet, outlet, and a site gauge tube.  Started welding one fuel inlet bung, and tacked the top lid on the tank for later welding.   Hours: 2.5
Drilling holes in side of header tank

One fuel bung welded, top lid tacked in place

No comments: