Built a small wooden jig with notches to hold the header tank in a horizontal position during drilling. Drilled holes for fuel inlet, outlet, and a site gauge tube. Started welding one fuel inlet bung, and tacked the top lid on the tank for later welding. Hours: 2.5
|
Drilling holes in side of header tank |
|
One fuel bung welded, top lid tacked in place |
No comments:
Post a Comment