After allowing the varnish to dry overnight the right butt rib installation was completed. This included riveting the front t-bracket, putting Hysol epoxy on the T-bracket flange and finally riveting the butt rib in place. The F-2200 read windshield bracket was cut down to fit between the two sides of the fuselage and deburred. Hours: 2
|
Right Butt Rib installation Complete |
No comments:
Post a Comment