Sunday, April 1, 2018

Right Butt Rib Completed

After allowing the varnish to dry overnight the right butt rib installation was completed.  This included riveting the front t-bracket, putting Hysol epoxy on the T-bracket flange and finally riveting the butt rib in place.  The F-2200 read windshield bracket was cut down to fit between the two sides of the fuselage and deburred.  Hours: 2

Right Butt Rib installation Complete

No comments: