Sunday, July 31, 2016
More work on leading edge for right aileron & flap
We continued working on the leading edge for the right aileron and flap (similar to what we've already done on the the same parts for the left side). We filed a few false ribs so that they would fit around the hinges and bell-crank, prepped the fiberglass surface for gluing, and then epoxied 14 false ribs into the leading edge of the right aileron. After the epoxy had set for about an hour, we smoothed the glue fillets. We also prepped the right flap for the same procedure, but will epoxy the false ribs into that flap another day. Hours: 2.5
Thursday, July 28, 2016
Right Aileron and Flap False Rib Locations
We marked the location of the false ribs, first on the right flap and then on the right aileron. This went a lot quick since we had the locations with dimensions written down from the left flap and aileron. Hours: 1.0
![]() |
| Ed Marking Location of Aileron False Ribs |
Sunday, July 24, 2016
Right aileron and flaps (leading edge) Continued
Ed and I did the final fitting of last leading edge fiberglass piece. A little sanding here and a little sanding there. Hours: 1
Saturday, July 23, 2016
Right aileron and flaps (leading edge)
After a brief hiatus for summer vacations, plus trying to get other stuff done around the house, we finally got back to working on the ailerons and flaps. Previously, we had worked on the fiberglass leading edge for the left-side aileron and flaps. Now we shifted to the same tasks, but on the right-side aileron and flaps.
This is messy work because we are carefully cutting, trimming, and sanding fiberglass. The picture shows Michael test-fitting the fiberglass leading edge piece onto the aileron, and you can see that gloves and a breathing filter are needed to keep all the fine fiberglass dust from becoming an irritant. The trimming and fitting takes a bit of time because we have to be careful so that it fits nicely at each rib, and don't want to mess up and trim off too much. Hours: 2.5
This is messy work because we are carefully cutting, trimming, and sanding fiberglass. The picture shows Michael test-fitting the fiberglass leading edge piece onto the aileron, and you can see that gloves and a breathing filter are needed to keep all the fine fiberglass dust from becoming an irritant. The trimming and fitting takes a bit of time because we have to be careful so that it fits nicely at each rib, and don't want to mess up and trim off too much. Hours: 2.5
![]() |
| Michael test fitting the fiberglass leading edge onto the aileron |
Sunday, June 26, 2016
False ribs in leading edge of left flap
Glued false ribs into the left flap leading edge with Hysol epoxy. The false ribs were secured in place with masking tape, which basically clamped the fiberglass leading edge over the wood ribs. The Hysol was worked and smoothed to make nice fillets at the base of the ribs after drying about 30 minutes. Hours: 2.0
![]() |
| Wooden false rib taped and glued |
Tuesday, June 21, 2016
Left Flap Leading Edge
The left flap's fiberglass leading edge was cut to length. The false rib locations were located using the same methodology as the aileron. Hours: 1
Saturday, June 18, 2016
Left flap & aileron leading edge
Carefully positioned and attached false ribs to the leading edge of the left aileron with Hysol epoxy. Also began trimming the fiberglass piece for the left flap. Hours: 2.0
Thursday, June 16, 2016
Left Aileron False Nose Ribs
After consulting the Just Aircraft Wings Forum I found a posting that was perfect and even included a drawings of the placement of the false nose ribs. This was tremendously helpful. This was discussed in 2011....why oh why hasn't the builder's manual been updated? The locations were marked on on the leading edge fiberglass and the false ribs were temporarily fit. Two of the ribs are going to require some custom fitting at the spar due to interference with the hinge brackets. Hours: 1
![]() |
| False Nose Ribs Locations Marked |
Wednesday, June 15, 2016
Aileron False Nose Ribs
The manual gives the location of the false nose ribs. But to be honest, it is extremely lacking and confusing. We were given 54 total false ribs which equates to 14 per Aileron/Flap. After locating two false ribs around each hinge point (x6) the remaining 8 false ribs were located based on feedback from other builders. Hours: 1
Saturday, June 11, 2016
Aileron leading edge prep
Trimmed and fit the fiberglass leading edge for the left aileron. Picture below shows some sanding that was done to the fiberglass piece to fit it precisely to the aileron. The ends were also cut to length and sanded so that they match the ends of the aileron. Hours: 2.5
![]() |
| Michael is sanding the fiberglass leading edge |
Wednesday, June 8, 2016
Aileron and Flap Hinges
The aileron and flap surfaces were slightly abraded and cleaned at the points where the hinges and bell cranks attached. A layer of Hysol epoxy was then applied to the hinges and bell cranks, and these were then riveted using CCP44 rivets to the flaps and ailerons. This gets a little messy with excess epoxy squeezing out from under the parts during riveting. A total of 8 hinges (2 on each aileron and flap), and a total of 4 bellcranks (1 in the middle of each aileron and flap) were attached. Excess adhesive was wiped away after riveting. Hours: 2.5
![]() |
| Bellcrank Attached |
![]() |
| Hinge Attached |
![]() |
| Left Flap with 2 hinges and bellcrank attached |
Monday, June 6, 2016
Aileron Flap Work
We continued work on the remaining aileron and flaps by precisely locating (9.5" from trailing edge to hinge point for ailerons and 10" for the flaps) the two hinges and middle bellcrank on the right aileron and both flaps They were clamped in place using worm hose clamps and drilled for rivets. The parts were temporarily cleco'd until the other aileron and flaps are complete The holes on all four parts were deburred. Hours: 2.5
Sunday, May 29, 2016
Aileron Hinge/BellCrank Attachment
After a brief hiatus on building we finally got back out in the garage on our build. We found we still needed to up-drill and ream the the hinge brackets to 5/16". After completing that task, we precisely located (9.5" from trailing edge to hinge point) the two hinges and middle bellcrank on the left aileron. They were clamped in place using worm hose clamps and drilled for rivets. The parts were temporarily cleco'd until the other aileron and flaps are complete. Hours: 2
![]() |
| Center Bellcrank |
![]() |
| Outer Hinge |
![]() |
| Left Aileron with Hinges and Bellcrank Cleco'd |
Sunday, May 15, 2016
Attended Superflite workshop
Michael and I attended a workshop on aircraft fabric and painting using the Superflite system. The 2 day workshop was held in Brasstown, NC. Learned a lot and we were very happy with how these test parts (gear legs) turned out in the end. Hours: 12
Labels:
Misc
Sunday, May 1, 2016
Wings in Shed
Time to put the wings back in storage until needed again a little later. It was either that, or build a larger garage. Instead of returning the wings to the airport for storage, we decided to hang them up in the shed for easier (and quicker) retrieval. We used some black strapping to tie them up in the rafters, as shown in the pics. Hours: 2.5
![]() |
| Wings hung up in the shed |
![]() |
| Black strap under the fuel tank on one end of a wing |
Labels:
Wings
Subscribe to:
Posts (Atom)














